The entire E-Course and E-Module catalog of The Nielsen Environmental E-School is now available for downloading and sharing! 

E-Courses and E-Modules Now Available:

The Environmental Sampling E-Course

environmental-new-shadowFor a detailed description of this E-Course, click here

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 32 E-Modules listed below, OR you may take any of the individual modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: Planning an Effective Environmental Sampling Program – The Sampling & Analysis Plan

  • Module ES–01 -- Planning an Effective Environmental Sampling Program – The Sampling & Analysis Plan

Topic: Developing an Effective Environmental Sampling Strategy

  • Module ES–02 -- Developing a Conceptual Site Model and Fine-Tuning it With Site Reconnaissance
  • Module ES–03 -- Strategies for Three-Dimensional Sampling of Environmental Media

Topic: Field Equipment Decontamination Procedures for Multi-Media Environmental Sampling

  • Module ES–04 -- Field Equipment Decontamination Procedures for Multi-Media Environmental Sampling

Topic: Field Quality Assurance/Quality Control Practices for Multi-Media Environmental Sampling

  • Module ES–05 -- Field Quality Assurance/Quality Control Practices for Multi-Media Environmental Sampling

Topic: Environmental Sample Handling and Shipment

  • Module ES–06 -- Environmental Sample Handling and Shipment

Topic: Documentation of Environmental Sampling Events

  • Module ES–07 -- Documentation of Environmental Sampling Events

Topic: The Science Behind Soil Sampling

  • Module ES–08 -- The Science Behind Soil Sampling – Part 1
  • Module ES–09 -- The Science Behind Soil Sampling – Part 2
  • Module ES–10 -- The Science Behind Soil Sampling – Part 3

Topic: Selection and Use of Soil Sampling Equipment

  • Module ES–11 -- Selection and Use of Soil Sampling Equipment – Part 1
  • Module ES–12 -- Selection and Use of Soil Sampling Equipment – Part 2

Topic: Soil Sample Handling and Processing Using U.S. EPA Method 5035B

  • Module ES–13 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Introduction; Use of Volumetric Sample Collection Methods
  • Module ES–14 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Use of Chemical Preservation/Extraction Methods

Topic: Field Sample Analysis Options for Soil Samples

  • Module ES–15 -- Field Sample Analysis Options for Soil Samples

Topic: Soil Sample Collection, Description & Handling in the Field

  • Module ES-16 -- Soil Sample Collection, Description & Handling in the Field -- Planning and Preparation for Soil Sample Collection and Description; Describing Soil Samples in the Field (Part 1)
  • Module ES-17 -- Soil Sample Collection, Description & Handling in the Field -- Describing Soil Samples in the Field (Part 2); Handling Soil Samples in the Field

Topic: The Science Behind Ground-Water Sampling

  • Module ES-18 -- The Science Behind Ground-Water Sampling (Part 1): Defining Sampling Objectives; Accuracy, Precision & Bias; Uses of Water-Level Data; Water-Level Measurement Methods; Sources of Bias and Error in Water-Level Measurement
  • Module ES-19 -- The Science Behind Ground-Water Sampling (Part 2): Sources of Bias and Error in Ground-Water Sampling; Factors Affecting the Representative Nature of Ground-Water Samples

Topic: Selection and Operation of Ground-Water Purging & Sampling Devices

  • Module ES-20 -- Selection and Operation of Ground-Water Purging & Sampling Devices (Part 1) -- Sampling Device Selection Criteria; Sampling Device Impacts on Sample Chemistry; Operational Characteristics and Limitations of Grab Samplers, Suction-Lift Pumps & Electric Centrifugal Submersible Pumps
  • Module ES–21 -- Selection and Operation of Ground-Water Purging & Sampling Devices (Part 2) -- Operational Characteristics and Limitations of Positive Displacement Pumps (Gear-Drive Electric Submersible Pumps, Double-Acting Piston Pumps, Gas-Drive Pumps and Bladder Pumps) and Inertial-Lift Devices

Topic: Conventional Purging and Sampling Practices

  • Module ES–22 -- Conventional Purging and Sampling Practices for High-Yield and Low-Yield Wells – Well-Volume Purging; Purging to Stabilization of Water-Quality Indicators; Purging to Dryness, Then Sampling

Topic: Low-Flow Purging and Sampling and No-Purge Sampling

  • Module ES–23 -- Practices and Procedures for Low-Flow Purging and Sampling
  • Module ES–24 -- Practices and Procedures for No-Purge Sampling

Topic: Field Parameter Measurement During Well Purging

  • Module ES–25 -- Field Water-Quality Indicator Parameter Measurement During Well Purging

Topic: Ground-Water Sample Pretreatment – Filtration and Preservation

  • Module ES–26 -- Ground-Water Sample Filtration
  • Module ES–27 -- Ground-Water Sample Preservation

Topic: Overview of Aquatic Systems and Sampling Strategies and Devices for Surface Water

  • Module ES–28 -- Overview of Aquatic Systems and Sampling Strategies for Surface Water
  • Module ES–29 -- Overview of Surface-Water Sampling Devices

Topic: Overview of Sampling Strategies and Sampling Devices for Sediment

  • Module ES-30 -- Overview of Sampling Strategies and Sampling Devices for Sediment

Topic: Waste Sampling Strategies and Methods

  • Module ES-31 -- Waste Sampling Strategies and Methods -- Planning a Waste Sampling Program; Sampling Strategies and Devices for Drums, Tanks and Other Containers
  • Module ES-32 -- Waste Sampling Strategies and Methods -- Sampling Strategies and Devices for Dumps and Landfills; Stockpiles and Waste Piles; Lagoons, Basins and Pits; Artifactual Sampling

The Complete Ground-Water Monitoring E-Course

drillingFor a detailed description of this E-Course, click here

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 29 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: Optimizing Monitoring Well Placement

  • Module GWM-01 - Ground-Water Monitoring Program and Monitoring System Design Elements; Establishing Monitoring Program and Monitoring System Objectives, Data Needs and Uses
  • Module GWM-02 - Assembling and Evaluating Important Existing Information (Part 1); Types and Sources of Existing Information
  • Module GWM-03 - Assembling and Evaluating Important Existing Information (Part 2); Using Existing Information to Prepare an Initial Conceptual Site Model
  • Module GWM-04 - Conducting a Detailed 3-Dimensional Environmental Site Characterization Program – Approaches, Tools and Methods
  • Module GWM-05 - Refining the Conceptual Site Model; Selecting Optimum Monitoring Point Locations in 3 Dimensions

Topic: Environmental Drilling Technology for Site Characterization and Monitoring Well Installation

  • Module GWM-06 - Factors to Consider in Selecting a Drilling Method; Descriptions, Applications and Limitations of Casing Advancement Drilling Methods
  • Module GWM-07 - Descriptions, Applications and Limitations of Fluid Circulation Drilling Methods and Hollow-Stem Augers

Topic: Soil Sample Collection, Description and Handling in the Field

  • Module GWM-08 - Planning and Preparation for Soil Sample Collection and Description; Describing Soil Samples in the Field (Part 1)
  • Module GWM-09 - Describing Soil Samples in the Field (Part 2); Handling Soil Samples in the Field

Topic: Ground-Water Monitoring Well Design and Construction

  • Module GWM-10 - Objectives and Purposes of Monitoring Wells; Sources of Chemical Interference in Well Construction; Selection of Well Casing and Screen Materials; Methods for Joining Well Casing and Screen
  • Module GWM-11 - Optimizing Well Diameter; Types and Designs of Well Screens; Selecting Filter-Pack Material Size and Well Screen Slot Size; Optimizing Well Screen Length; Options for Monitoring Multiple Target Monitoring Zones
  • Module GWM-12 - Selection and Installation of Filter-Pack Material Type; Selection and Installation of Effective Annular Seal Materials
  • Module GWM-13 - Surface Protection for Monitoring Wells; Alternate Well Completions; Direct-Push Well Installation

Topic: Ground-Water Monitoring Well Development

  • Module GWM-14 - Ground-Water Monitoring Well Development – Objectives, Applications, Methods and Procedures

Topic: Planning and Executing a Successful Ground-Water Sampling Event

  • Module GWM-15 - Planning and Executing a Successful Ground-Water Sampling Event

Topic: Field Equipment Decontamination Procedures

  • Module GWM-16 - Field Decontamination Procedures for Ground-Water Sampling Equipment

Topic: Field Quality Assurance/Quality Control Practices

  • Module GWM-17 – Field Quality Assurance/Quality Control Practices for Ground-Water Sampling Events

Topic: The Science Behind Ground-Water Sampling

  • Module GWM-18 - The Science Behind Ground-Water Sampling (Part 1): Objectives of Ground-Water Sampling; The Importance of High-Quality Data; Uses of Water-Level Data; Water-Level Measurement Methods and Procedures; Recognizing and Avoiding Sources of Bias and Error in Water-Level Measurement
  • Module GWM-19 - The Science Behind Ground-Water Sampling (Part 2): Sources of Bias and Error in Ground-Water Sampling; Conditions Under Which Ground Water Occurs; Factors Affecting the Representative Nature of Ground-Water Samples

Topic: Selection and Operation of Ground-Water Purging and Sampling Devices

  • Module GWM-20 - Purging and Sampling Device Selection Criteria; Operational Characteristics, Applications and Limitations of Grab Samplers, Suction-Lift Pumps and Electric Centrifugal Submersible Pumps
  • Module GWM-21 - Operational Characteristics, Applications and Limitations of Positive Displacement Pumps (Gear-Drive Electric Submersible Pumps, Double-Acting Piston Pumps, Bladder Pumps and Gas-Drive Pumps) and Inertial-Lift Pumps

Topic: Conventional Purging and Sampling Practices

  • Module GWM-22 - Conventional Purging and Sampling Practices for High-Yield and Low-Yield Wells

Topic: Low-Flow Purging and Sampling and No-Purge Sampling

  • Module GWM-23 - Practices and Procedures for Low-Flow Purging and Sampling
  • Module GWM-24 - Practices and Procedures for No-Purge Sampling

Topic: Field-Parameter Measurement During Well Purging

  • Module GWM-25 - Field Water-Quality Indicator Parameter Measurement During Well Purging

Topic: Ground-Water Sample Pretreatment: Filtration and Preservation

  • Module GWM-26 - Ground-Water Sample Filtration
  • Module GWM-27 - Ground-Water Sample Preservation

Topic: Ground-Water Sample Handling and Shipment

  • Module GWM-28 – Ground-Water Sample Handling and Shipment

Topic: Sampling Event Documentation

  • Module GWM-29 - Documentation of Ground-Water Sampling Events

 


 

The Ground-Water Monitoring Well Design, Construction & Development E-Course

gwm2For a detailed description of this E-Course, click here.

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 14 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: Optimizing Monitoring Well Placement

  • Module GWM-01 - Ground-Water Monitoring Program and Monitoring System Design Elements; Establishing Monitoring Program and Monitoring System Objectives, Data Needs and Uses
  • Module GWM-02 - Assembling and Evaluating Important Existing Information (Part 1); Types and Sources of Existing Information
  • Module GWM-03 - Assembling and Evaluating Important Existing Information (Part 2); Using Existing Information to Prepare an Initial Conceptual Site Model
  • Module GWM-04 - Conducting a Detailed 3-Dimensional Environmental Site Characterization Program – Approaches, Tools and Methods
  • Module GWM-05 - Refining the Conceptual Site Model; Selecting Optimum Monitoring Point Locations in 3 Dimensions

Topic: Environmental Drilling Technology for Site Characterization and Monitoring Well Installation

  • Module GWM-06 - Factors to Consider in Selecting a Drilling Method; Descriptions, Applications and Limitations of Casing Advancement Drilling Methods
  • Module GWM-07 - Descriptions, Applications and Limitations of Fluid Circulation Drilling Methods and Hollow-Stem Augers

Topic: Soil Sample Collection, Description and Handling in the Field

  • Module GWM-08 - Planning and Preparation for Soil Sample Collection and Description; Describing Soil Samples in the Field (Part 1)
  • Module GWM-09 - Describing Soil Samples in the Field (Part 2); Handling Soil Samples in the Field

Topic: Ground-Water Monitoring Well Design and Construction

  • Module GWM-10 - Objectives and Purposes of Monitoring Wells; Sources of Chemical Interference in Well Construction; Selection of Well Casing and Screen Materials; Methods for Joining Well Casing and Screen
  • Module GWM-11 - Optimizing Well Diameter; Types and Designs of Well Screens; Selecting Filter-Pack Material Size and Well Screen Slot Size; Optimizing Well Screen Length; Options for Monitoring Multiple Target Monitoring Zones
  • Module GWM-12 - Selection and Installation of Filter-Pack Material Type; Selection and Installation of Effective Annular Seal Materials
  • Module GWM-13 - Surface Protection for Monitoring Wells; Alternate Well Completions; Direct-Push Well Installation

Topic: Ground-Water Monitoring Well Development

  • Module GWM-14 - Ground-Water Monitoring Well Development – Objectives, Applications, Methods and Procedures

 


 

The Complete Ground-Water Sampling E-Course

gws1For a detailed description of this E-Course, click here.

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 15 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: Planning and Executing a Successful Ground-Water Sampling Event

  • Module GWM-15 - Planning and Executing a Successful Ground-Water Sampling Event

Topic: Field Equipment Decontamination Procedures

  • Module GWM-16 - Field Decontamination Procedures for Ground-Water Sampling Equipment

Topic: Field Quality Assurance/Quality Control Practices

  • Module GWM-17 – Field Quality Assurance/Quality Control Practices for Ground-Water Sampling Events

Topic: The Science Behind Ground-Water Sampling

  • Module GWM-18 - The Science Behind Ground-Water Sampling (Part 1): Objectives of Ground-Water Sampling; The Importance of High-Quality Data; Uses of Water-Level Data; Water-Level Measurement Methods and Procedures; Recognizing and Avoiding Sources of Bias and Error in Water-Level Measurement
  • Module GWM-19 - The Science Behind Ground-Water Sampling (Part 2): Sources of Bias and Error in Ground-Water Sampling; Conditions Under Which Ground Water Occurs; Factors Affecting the Representative Nature of Ground-Water Samples

Topic: Selection and Operation of Ground-Water Purging and Sampling Devices

  • Module GWM-20 - Purging and Sampling Device Selection Criteria; Operational Characteristics, Applications and Limitations of Grab Samplers, Suction-Lift Pumps and Electric Centrifugal Submersible Pumps
  • Module GWM-21 - Operational Characteristics, Applications and Limitations of Positive Displacement Pumps (Gear-Drive Electric Submersible Pumps, Double-Acting Piston Pumps, Bladder Pumps and Gas-Drive Pumps) and Inertial-Lift Pumps

Topic: Conventional Purging and Sampling Practices

  • Module GWM-22 - Conventional Purging and Sampling Practices for High-Yield and Low-Yield Wells

Topic: Low-Flow Purging and Sampling and No-Purge Sampling

  • Module GWM-23 - Practices and Procedures for Low-Flow Purging and Sampling
  • Module GWM-24 - Practices and Procedures for No-Purge Sampling

Topic: Field-Parameter Measurement During Well Purging

  • Module GWM-25 - Field Water-Quality Indicator Parameter Measurement During Well Purging

Topic: Ground-Water Sample Pretreatment: Filtration and Preservation

  • Module GWM-26 - Ground-Water Sample Filtration
  • Module GWM-27 - Ground-Water Sample Preservation

Topic: Ground-Water Sample Handling and Shipment

  • Module GWM-28 – Ground-Water Sample Handling and Shipment

Topic: Sampling Event Documentation

  • Module GWM-29 – Documentation of Ground-Water Sampling Events

 


 

The Low-Flow Purging and Sampling and No-Purge Sampling E-Course

GWS2For a detailed description of this E-Course, click here.

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 13 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: The Science Behind Ground-Water Sampling

  • Module GWM-18 - The Science Behind Ground-Water Sampling (Part 1): Objectives of Ground-Water Sampling; The Importance of High-Quality Data; Uses of Water-Level Data; Water-Level Measurement Methods and Procedures; Recognizing and Avoiding Sources of Bias and Error in Water-Level Measurement
  • Module GWM-19 - The Science Behind Ground-Water Sampling (Part 2): Sources of Bias and Error in Ground-Water Sampling; Conditions Under Which Ground Water Occurs; Factors Affecting the Representative Nature of Ground-Water Samples

Topic: Low-Flow Purging and Sampling

  • Module GWM-23 - Practices and Procedures for Low-Flow Purging and Sampling

Topic: Selection and Operation of Ground-Water Purging and Sampling Devices

  • Module GWM-20 - Purging and Sampling Device Selection Criteria; Operational Characteristics, Applications and Limitations of Grab Samplers, Suction-Lift Pumps and Electric Centrifugal Submersible Pumps
  • Module GWM-21 - Operational Characteristics, Applications and Limitations of Positive Displacement Pumps (Gear-Drive Electric Submersible Pumps, Double-Acting Piston Pumps, Bladder Pumps and Gas-Drive Pumps) and Inertial-Lift Pumps

Topic: Field-Parameter Measurement During Well Purging

  • Module GWM-25 - Field Water-Quality Indicator Parameter Measurement During Well Purging

Topic: No-Purge Sampling

  • Module GWM-24 - Practices and Procedures for No-Purge Sampling

Topic: Field Equipment Decontamination Procedures

  • Module GWM-16 - Field Decontamination Procedures for Ground-Water Sampling Equipment

Topic: Field Quality Assurance/Quality Control Practices

  • Module GWM-17 – Field Quality Assurance/Quality Control Practices for Ground-Water Sampling Events

Topic: Ground-Water Sample Pretreatment: Filtration and Preservation

  • Module GWM-26 - Ground-Water Sample Filtration
  • Module GWM-27 - Ground-Water Sample Preservation

Topic: Ground-Water Sample Handling and Shipment

  • Module GWM-28 – Ground-Water Sample Handling and Shipment

Topic: Sampling Event Documentation

  • Module GWM-29 – Documentation of Ground-Water Sampling Events

The Complete Soil Sampling E-Course

soil-sampling-articleFor a detailed description of this E-Course, click here. 

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 17 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: Planning an Effective Soil Sampling Program – The Sampling & Analysis Plan

  • Module SS-01 -- Planning an Effective Soil Sampling Program – The Sampling & Analysis Plan

Topic: Developing an Effective Soil Sampling Strategy

  • Module SS-02 -- Developing a Conceptual Site Model and Fine-Tuning it With Site Reconnaissance
  • Module ES-03 -- Strategies for Three-Dimensional Sampling of Soil

Topic: Field Equipment Decontamination Procedures for Soil Sampling

  • Module SS-04 -- Field Equipment Decontamination Procedures for Soil Sampling

Topic: Field Quality Assurance/Quality Control Practices for Soil Sampling

  • Module SS-05 -- Field Quality Assurance/Quality Control Practices for Soil Sampling

Topic: The Science Behind Soil Sampling

  • Module SS-06 -- The Science Behind Soil Sampling – Part 1
  • Module SS-07 -- The Science Behind Soil Sampling – Part 2
  • Module SS-08 -- The Science Behind Soil Sampling – Part 3

Topic: Selection and Use of Soil Sampling Equipment

  • Module SS-09 -- Selection and Use of Soil Sampling Equipment – Part 1
  • Module SS-10 -- Selection and Use of Soil Sampling Equipment – Part 2

Topic: Soil Sample Handling and Processing Using U.S. EPA Method 5035B

  • Module SS-11 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Introduction; Use of Volumetric Sample Collection Methods
  • Module SS-12 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Use of Chemical Preservation/Extraction Methods

Topic: Field Sample Analysis Options for Soil Samples

  • Module SS-13 -- Field Sample Analysis Options for Soil Samples

Topic: Soil Sample Collection, Description & Handling in the Field

  • Module SS-14 -- Soil Sample Collection, Description & Handling in the Field -- Planning and Preparation for Soil Sample Collection and Description; Describing Soil Samples in the Field (Part 1)
  • Module SS-15 -- Soil Sample Collection, Description & Handling in the Field -- Describing Soil Samples in the Field (Part 2); Handling Soil Samples in the Field

Topic: Soil Sample Handling and Shipment

  • Module SS-16 -- Soil Sample Handling and Shipment

Topic: Documentation of Environmental Sampling Events

  • Module SS-17 -- Documentation of Environmental Sampling Events

The Soil Sampling for Volatile Organic Compounds (VOCs) E-Course

ss-vocFor a detailed description of this E-Course, click here.

E-Modules are listed under specific topics covered in the E-Course.  You may take the entire package of 14 E-Modules listed below, OR you may take any of the individual E-Modules separately.  For a detailed description and outline for the individual E-Modules listed under a topic, click on the topic. 

Topic: The Science Behind Soil Sampling

  • Module SS-06 -- The Science Behind Soil Sampling – Part 1
  • Module SS-07 -- The Science Behind Soil Sampling – Part 2
  • Module SS-08 -- The Science Behind Soil Sampling – Part 3

Topic: Selection and Use of Soil Sampling Equipment

  • Module SS-09 -- Selection and Use of Soil Sampling Equipment – Part 1
  • Module SS-10 -- Selection and Use of Soil Sampling Equipment – Part 2

Topic: Soil Sample Handling and Processing Using U.S. EPA Method 5035B

  • Module SS-11 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Introduction; Use of Volumetric Sample Collection Methods
  • Module SS-12 -- Soil Sample Handling and Processing Using U.S. EPA Method 5035B – Use of Chemical Preservation/Extraction Methods

Topic: Field Sample Analysis Options for Soil Samples

  • Module SS-13 -- Field Sample Analysis Options for Soil Samples

Topic: Field Equipment Decontamination Procedures for Soil Sampling

  • Module SS-04 -- Field Equipment Decontamination Procedures for Soil Sampling

Topic: Field Quality Assurance/Quality Control Practices for Soil Sampling

  • Module SS-05 -- Field Quality Assurance/Quality Control Practices for Soil Sampling

Topic: Soil Sample Collection, Description & Handling in the Field

  • Module SS-14 -- Soil Sample Collection, Description & Handling in the Field -- Planning and Preparation for Soil Sample Collection and Description; Describing Soil Samples in the Field (Part 1)
  • Module SS-15 -- Soil Sample Collection, Description & Handling in the Field -- Describing Soil Samples in the Field (Part 2); Handling Soil Samples in the Field

Topic: Soil Sample Handling and Shipment

  • Module SS-16 -- Soil Sample Handling and Shipment

Topic: Documentation of Environmental Sampling Events

  • Module SS-17 -- Documentation of Environmental Sampling Events